Tuesday, December 14, 2010

D1 two pickups aas lost



945 wup
1015 4313 10kw went sl fhm 12 wtm 4 fansusweetsoup 2.2?
1020 tapao nl 1.5 2 paos 3 roastchic2p 7
1030 speechless with towel wipe tiffin
1045 feed wheels
1100 back and wait
1350 got call about pick up
1400 push 3 out and wait
1445 collected bye bye
1640 one arrived eat 6 hm suikows
1700 left 19.2k to reach toll (2.5)
- imm after toll, turn left to sib/put
- after satelite, turn left stay right to deng
- then a short while must turn left again to deng else straight go put
spent 5k lost in put
1730 back on track
- 4.4k on go straight ignore left to deng cementery (htl si pang)
- 6.6k on straight in + traffic light
- 4.4k reach unfinish bridge (kt wwsn) keep left right to turn right traffic lights
- 2.6k see mos on left ahead turn left
- 1k reach roundabout 9oclk
1812 another 12k reach (pass traffic light, rd 3oclk)
- used 1h 12m 58.8-5 = 53.8k to

1840 left
-10k to rdbt mos 3oclk
- turn right
- turn left at unfinished bridge (kt wwsn)
- 29.3k from aas straight until pass beautiful thick put bridge keep left turn left mex e20
- another 1k pass satelit
- another 1.7k keep left to turn left into mex e20
lost for 26.2k on elite put to putra h uturn

2000 back 143.8k - 5k - 26.2k = should be 112.6k - 53.8 (to) = 58.8 (fro)

2230 sleep headache toothache no online

hl: joyride for 31.2k

No comments: