Monday, July 27, 2009

Work started today!

Sand and steel came in today for rectifying defects for a customer. Bundled up the irons into pillar shapes. Long chat with 3G. Dropped and collected up the card for D. Got a HDMI cable for 2290 and 4 bulbs for 1190 each after 3 hours. Locked up again. Cables are as per specs. Started adding the extra 2 plug points and aligning one. Replaced the loose rubber lining. Hacked and removed the tile surrounding the drainage cover. Plastered over the cut lines in the fiberboard ceiling. 95 for a 2-month job. Target Oct 09. No jail bars.